Roosecote Power Station

Scaffolding of the two 25m diameter cylindrical oil storage tanks and the four 27m inlet pipelines at Roosecote Power Station, Barrow-In-Furness.

Both of the oil tanks in Barrow were fully scaffolded and sheeted to provide access for extensive blast and painting. The scaffold had to be splayed every 3.8m to accommodate the shape of the tanks. Each tank was erected in just ten days, well ahead of the program.