Cannon Hussey

This scaffold has been erected for dual purposes, it is to act as a heavy duty platform to facilitate the landing of and access to a series of mast climbers being used by the contractor for restoration and remedial works to the facade of the building and also transportation of materials required for the internal fit out works.

It has been erected to withstand the loadings imposed from the mast climber as well as any materials it may be loaded with.

The second and more important purpose is a pedestrian protection scaffold, as the tower block being rejuvenated is still fully occupied, this had to be erected in a way to ensure the maximum protection of all tenants accessing and exiting the building during their normal day to day activities.